Kansas City Current Training Complex

As the first-ever training facility built specifically for a U.S. women’s professional sports team, the Kansas City Current’s riverfront complex is setting the standard for the National Women’s Soccer League. The goal was historic: bring the spirit of the KC Current to life throughout a world-class home designed to inspire the team, its staff and the next generation of female athletes.

Project Details

Building a Historic Home for the Kansas City Current

DI partnered with brand strategist and designer Willoughby Design, alongside Monarch Build and Generator Studio, to bring the KC Current’s training complex to life through branded design and “wow” moments inside and out. From entry to exit, teal and heartland red ripple through custom designs that celebrate Current pride around every corner. In the state-of-the-art locker room, DI fabricated and installed a massive illuminated crest that shines above the team, a daily reminder of who they play for.

 

Challenge

As the first-ever team office and training complex built specifically for a U.S. women’s professional sports organization, the Kansas City Current’s home digs is setting the precedent for the National Women’s Soccer League (NWSL). And just like any Teal Rising victory, making this historic facility a reality took a collaborative team effort.

Monarch Build constructed the riverfront complex in partnership with Generator Studio, creating a space full of world-class amenities that empower the team to train, recover, strategize and connect – all on their own turf.

Brand strategist and designer, Willoughby Design, turned to Dimensional Innovations to help bring the space to life through branded design and ‘wow’ elements throughout the interior and exterior of the complex.

 

SOLUTION

Our team weaved the essence of the KC Current into the complex, creating a sleek, purpose-driven home to inspire the team, staff, and aspiring young female athletes.

From entry to exit, the all-encompassing space is chock-full of teal and heartland red, with custom designs rippling Current pride around every corner. The facility also includes a state-of-the-art locker room where Dimensional Innovations fabricated and installed a massive crest that brightly shines above.

 

Impact

The prestigious training facility is a fierce, industry-leading, game-winning initiative that empowers the KC Current to train like pros on an off the pitch.

As the organization continues to pave the way for the future of NWSL and women’s professional sports, Dimensional Innovations is honored to play our part – as fans, fellow Kansas Citians, and in this case, experts in design fabrication.

  • Location


    Inglewood, California

  • Experts


    Justin Wood

    Lyndee Trost

  • Services


    Fan Experience

    Sponsorship Activations

    Environmental Design

    Signage and Wayfinding

  • Key Partners


    LA Clippers

    CAA Icon

    AECOM

    Turner Hunt

    Joint Venture

    Daktronics

    Misapplied Sciences

    Downstream

    Globant

    B. Partners

  • Recognition


    2025 SBJ’s Sport Facility of the Yea

    2025 TIME World’s GreatestPlaces

    2025 StadiumBusiness Award Venue of the Year

  • 17,000 sq. feet

    Size of training complex

  • 11,500

    Current seating capacity

Parnter Testimonial

“I can’t explain how impressed I am with the facility Kansas City has…I look back to the beginning of the NWSL and it couldn’t be more different”

Alex Morgan, United States Women’s National Soccer Team

Just Women’s Sports

Your next big idea starts here.

Let’s make your next project remarkable.